I managed to work in some time to work on the truck, I trimmed the plastic shield that will protect the motor from rocks and water and got it installed. I also fabricated the panel that covers the radiator opening and mounted it in place.
I wrestled the 85# control box into the engine bay and bolted it in place.
I connected the throttle linkage and checked operation. I also ran some of the wiring to the control box.

No comments:
Post a Comment